Jump to content

List of commercial nuclear reactors

From Wikipedia, the free encyclopedia

This is a list of all the commercial nuclear reactors in the world, sorted by country, with operational status. The list only includes civilian nuclear power reactors used to generate electricity for a power grid. All commercial nuclear reactors use nuclear fission. As of July 2024, there are 415 operable power reactors in the world, with a combined electrical capacity of 373.7 GW. Additionally, there are 61 reactors under construction and 92 reactors planned, with a combined capacity of 68 GW and 90 GW, respectively, while 343 more reactors are proposed.[1] For non-power reactors, see List of nuclear research reactors. For fuel plants see List of nuclear reprocessing plants. Where not otherwise specified, all information is sourced from the Power Reactor Information System (PRIS) of the International Atomic Energy Agency (IAEA).[2]

In the following tables, the capacity (expressed in megawatt, MW) refers to the net capacity, or the maximum electricity output under reference ambient conditions, after deducting the losses within the system including the energy transformers.[3]

Argentina

[edit]
Plant
name
Unit
No.
Type Model Status Capacity
(MW)
Begin
building
Commercial
operation
Closed
Atucha[4] 1 PHWR Siemens-KWU Operation suspended
(under maintenance)
362 1 Jun 1968 24 Jun 1974
2 PHWR Siemens-KWU Operational 745 14 Jul 1981 27 Jun 2014
3 PWR Hualong One Planned[5] 1200
Embalse[6] 1 PHWR CANDU-6 Operational 683 1 Apr 1974 20 Jan 1984 (2049)[7]
CAREM 1 PWR CAREM25 Under construction 25 8 Feb 2014

Armenia

[edit]
Plant
name
Unit
No.
Type Model Status Capacity
(MW)
Begin
building
Commercial
operation
Closed
Metsamor 1 PWR VVER-440/V-270 Shut down 376 1 Jul 1969 6 Oct 1977 25 Feb 1989
2 PWR VVER-440/V-270 Operational 375 1 Jul 1975 3 May 1980 (2026)[8]

Austria

[edit]
Plant
name
Unit
No.
Type Model Status Capacity
(MW)
Begin
building
Commercial
operation
Closed
Zwentendorf 1 BWR BWR-69 (KWU) Finished; never entered service 878 Apr 1972 5 Nov 1978

Bangladesh

[edit]
Plant
name
Unit
No.
Type Model Status Capacity
(MW)
Begin
building
Commercial
operation
Closed
Rooppur 1 PWR VVER-1200/V-523 Under construction 1080 30 Nov 2017[9] (2025)
2 PWR VVER-1200/V-523 Under construction 1080 14 Jul 2018 (2026)

Belarus

[edit]
Plant
name
Unit
No.
Type Model Status Capacity
(MW)
Begin
building
Commercial
operation
Closed
Ostrovets 1 PWR VVER-1200/V-491 Operational 1109 6 Nov 2013 10 Jun 2021[10]
2 PWR VVER-1200/V-491 Operational 1109 24 Apr 2014 1 Nov 2023[11]
Minsk 1 PWR VVER-1000 Unfinished 963 1983 1987
2 PWR VVER-1000 Unfinished 963 1983 1987

Belgium

[edit]
Plant
name
Unit
No.
Type Model Status Capacity
(MW)
Begin
building
Commercial
operation
Closed
SCK•CEN 1 PWR Westinghouse (WH) BR-3 Decommissioned 10 1 Nov 1957 10 Oct 1962 30 Jun 1987
Doel 1 PWR WH 2 loops Operational 445 1 Jul 1969 15 Feb 1975 (15th feb. 2025)
2 PWR WH 2 loops Operational 445 1 Sep 1971 1 Dec 1975 (1st dec. 2025)
3 PWR Framatome 3 loops Shut down 1006 1 Jan 1975 1 Oct 1982 23 Sep 2022[12]
4 PWR Belgian firms plus WH 3 loops Operational 1039 1 Dec 1978 1 Jul 1985 (1st jul. 2025)

planned prolongation of operations until 2035 [13]

Tihange 1 PWR Framatome 3 loops Operational 962 1 Jun 1970 1 Oct 1975 (1st oct. 2025)
2 PWR Framatome 3 loops Shut down 1008 1 Apr 1976 1 Jun 1983 31 Jan 2023[14]
3 PWR Belgian firms plus WH 3 loops Operational 1046 1 Nov 1978 1 Sep 1985 (1st sept. 2025)

planned prolongation of operations until 2035

Brazil

[edit]
Plant
name
Unit
No.
Type Model Status Capacity
(MW)
Begin
building
Commercial
operation
Closed
Angra 1 PWR WH 2 loops Operational 609 1 May 1971 1 Jan 1985
2 PWR Pre-Konvoi Operational 1275 1 Jan 1976 1 Feb 2001
3 PWR Pre-Konvoi Under construction 1245 1 Jun 2010 (2028)[15]

Bulgaria

[edit]
Plant
name
Unit
No.
Type Model Status Capacity
(MW)
Begin
building
Commercial
operation
Closed
Kozloduy 1 PWR VVER-440/V-230 Shut down 408 1 Apr 1970 28 Oct 1974 31 Dec 2002
2 PWR VVER-440/V-230 Shut down 408 1 Apr 1970 10 Nov 1975 31 Dec 2002
3 PWR VVER-440/V-230 Shut down 408 1 Oct 1973 20 Jan 1981 31 Dec 2006
4 PWR VVER-440/V-230 Shut down 408 1 Oct 1973 20 Jun 1982 31 Dec 2006
5 PWR VVER-1000/V-320 Operational 1003 9 Jul 1980 23 Dec 1988
6 PWR VVER-1000/V-320 Operational 1003 1 Apr 1982 30 Dec 1993
7 PWR AP1000 Planned[16] 1150 (2033)[16]
8 PWR AP1000 Planned[16] 1150
Belene 1 PWR VVER-1000/V-320
VVER-1000/V-446B
Unfinished 953
1011
1987
2008
2 PWR VVER-1000/V-320
VVER-1000/V-446B
Unfinished 953
1011
1987
2008

Canada

[edit]
Plant
name
Unit
No.
Type Model Status Capacity
(MW)
Begin
building
Commercial
operation
Closed
Pickering 1 PHWR CANDU 500A Shut down 515 Jun 1966 29 Jul 1971 1 Oct 2024
2 PHWR CANDU 500A Shut down 515 Sep 1966 30 Dec 1971 31 Dec 1997[17]
3 PHWR CANDU 500A Shut down 515 Dec 1967 1 Jun 1972 29 Dec 1997
4 PHWR CANDU 500A Operational 515 May 1968 17 Jun 1973 (2024)
5 PHWR CANDU 500B Operational 516 Nov 1974 10 May 1983 (2026)
6 PHWR CANDU 500B Operational 516 Oct 1975 1 Feb 1984 (2026)
7 PHWR CANDU 500B Operational 516 Mar 1976 1 Jan 1985 (2026)
8 PHWR CANDU 500B Operational 516 Sep 1976 28 Feb 1986 (2026)[18]
Darlington 1 PHWR CANDU 850 Operational 878 Apr 1982 14 Nov 1992 (2052)
2 PHWR CANDU 850 Operational 878 Sep 1981 9 Oct 1990 (2050)
3 PHWR CANDU 850 Operational 878 Sep 1984 14 Feb 1993 (2053)
4 PHWR CANDU 850 Operational 878 Jul 1985 14 Jun 1993 (2053)
5[19] BWR BWRX-300 Planned 300 (2023) (2028)
6[19] BWR BWRX-300 Planned 300 (2023) (2028)
7 BWR BWRX-300 Planned 300 (2023) (2029)
8 BWR BWRX-300 Planned 300 (2023) (2029)[20]
Bruce 1 PHWR CANDU 791 Operational 823 Jun 1971 1 Sep 1977 (2043)
2 PHWR CANDU 791 Operational 823[21] Dec 1970 1 Sep 1977 (2043)
3 PHWR CANDU 750A Operational 817 Jul 1972 1 Feb 1978 (2064)[22]
4 PHWR CANDU 750A Operational 817 Sep 1972 18 Jan 1979 (2064)
5 PHWR CANDU 750B Operational 817 Jun 1978 1 Mar 1985 (2064)
6 PHWR CANDU 750B Operational 880[23] Jan 1978 15 Sep 1984 (2064)
7 PHWR CANDU 750B Operational 817 May 1979 10 Apr 1986 (2064)
8 PHWR CANDU 750B Operational 817 Aug 1979 22 May 1987 (2064)
NPD 1 PHWR CANDU Shut down 19 Jan 1958 4 Jun 1962 1 Aug 1987
Douglas Point 1 PHWR CANDU 200 Shut down 200 Feb 1960 26 Sep 1968 4 May 1984
Gentilly 1 BWR CANDU BLWR 250 Shut down 250 Sep 1966 1 May 1972 1 June 1977
2 PHWR CANDU-6 Shut down 635 Apr 1974 1 Oct 1983 28 Dec 2012
Point Lepreau 1 PHWR CANDU-6 Operational 635 May 1975 1 Feb 1983 (2041)

China

[edit]

Cuba

[edit]
Plant
name
Unit
No.
Type Model Status Capacity
(MW)
Begin
building
Commercial
operation
Closed
Juragua 1 PWR VVER-440/V-318 Unfinished 440 1983 5 Sep 1992
2 PWR VVER-440/V-318 Unfinished 440 1985 5 Sep 1992

Czech Republic

[edit]
Plant
name
Unit
No.
Type Model Status Capacity
(MW)
Begin
building
Commercial
operation
Closed
Dukovany 1 PWR VVER-440/V-213 Operational 468 1 Jan 1979 3 May 1985
2 PWR VVER-440/V-213 Operational 471 1 Jan 1979 21 Mar 1986
3 PWR VVER-440/V-213 Operational 468 1 Mar 1979 20 Dec 1986
4 PWR VVER-440/V-213 Operational 471 1 Mar 1979 19 Jul 1987
5 PWR TBD Planned 1200
6 PWR TBD Planned 1200
Temelín 1 PWR VVER-1000/V-320 Operational 1003 1 Feb 1987 10 Jun 2002
2 PWR VVER-1000/V-320 Operational 1003 1 Feb 1987 18 Apr 2003
3 PWR TBD Planned 1200
4 PWR TBD Planned 1200

Egypt

[edit]
Plant
name
Unit
No.
Type Model Status Capacity
(MW)
Begin
building
Commercial
operation
Closed
El Dabaa 1 PWR VVER-1200/V-529 Under construction 1200 20 Jul 2022[60] (2028)
2 PWR VVER-1200/V-529 Under construction 1200 19 Nov 2022[61]
3 PWR VVER-1200/V-529 Under construction 1200 3 May 2023[62]
4 PWR VVER-1200/V-529 Under construction 1200 23 Jan 2024

Finland

[edit]
Plant
name
Unit
No.
Type Model Status Capacity
(MW)[63]
Begin
building
Commercial
operation
Closed
Hanhikivi 1 PWR VVER-1200/V-491 Cancelled 1200 (2023) (2029) 2 May 2022[64][65]
Loviisa 1 PWR VVER-440/V-213 Operational 507 1 May 1971 9 May 1977
2 PWR VVER-440/V-213 Operational 507 1 Aug 1972 5 Jan 1981
Olkiluoto 1 BWR ASEA-III, BWR-2500 Operational 890 1 Feb 1974 10 Oct 1979
2 BWR ASEA-III, BWR-2500 Operational 890 1 Nov 1975 10 Jul 1982[66]
3 PWR EPR Operational 1600 12 Aug 2005 16 Apr 2023[67]

France

[edit]

Germany

[edit]

Hungary

[edit]
Plant
name
Unit
No.
Type Model Status Capacity
(MW)
Begin
building
Commercial
operation
Closed
Paks 1 PWR VVER-440/V-213 Operational 470 1 Aug 1974 10 Aug 1983
2 PWR VVER-440/V-213 Operational 473 1 Aug 1974 14 Nov 1984
3 PWR VVER-440/V-213 Operational 473 1 Oct 1979 1 Dec 1986
4 PWR VVER-440/V-213 Operational 471 1 Oct 1979 1 Nov 1987
5 PWR VVER-1200 Planned 1114 (2025)
6 PWR VVER-1200 Planned 1114 (2025)

India

[edit]

Iran

[edit]
Plant
name
Unit
No.
Type Model Status Capacity
(MW)
Begin
building
Commercial
operation
Closed
Bushehr 1 PWR VVER-1000/V-446 Operational 915 1 May 1975 23 Sep 2013
2 PWR VVER-1000/V-528 Under construction 915 27 Sep 2019
3 PWR VVER-1000 Planned 915
Darkhovin 1 PWR Unfinished; restart planned 360

Italy

[edit]
Plant
name
Unit
No.
Type Model Status Capacity
(MW)
Begin
building
Commercial
operation
Closed
Caorso 1 BWR BWR-4 Mark2 Shut down/in decommissioning 860 1 Jan 1970 1 Dec 1981 1 Jul 1990
Enrico Fermi 1 PWR WH 4-loop Shut down/in decommissioning 260 1 Jul 1961 1 Jan 1965 1 Jul 1990
Garigliano 1 BWR BWR-1 Shut down/in decommissioning 150 1 Nov 1959 1 Jun 1964 1 Mar 1982
Latina 1 GCR Magnox Shut down/in decommissioning 153 1 Nov 1958 1 Jan 1964 1 Dec 1987
Alto Lazio 1 BWR Unfinished 982 1 Jul 1982 1 Jan 1988
2 BWR Unfinished 982 1 Jul 1982 1 Jul 1988
Trino 2 [IT] 1 PWR Unfinished 950 23 Dec 1987
2 PWR Unfinished 950 23 Dec 1987

Japan

[edit]

Kazakhstan

[edit]
Plant
name
Unit
No.
Type Model Status Capacity
(MW)
Begin
building
Commercial
operation
Closed
Aktau 1 FBR BN-350 Shut down/in decommissioning 350 1 Oct 1964 16 Jul 1973 22 Apr 1999

Lithuania

[edit]
Plant
name
Unit
No.
Type Model Status Capacity
(MW)
Begin
building
Commercial
operation
Closed
Ignalina 1 LWGR RBMK-1500 Shut down/in decommissioning 1185 1 May 1977 31 Dec 1983 31 Dec 2004
2 LWGR RBMK-1500 Shut down/in decommissioning 1185 1 Jan 1978 Aug 1987 31 Dec 2009
3 LWGR RBMK-1500 Unfinished 1185

Mexico

[edit]
Plant
name
Unit
No.
Type Model Status Capacity
(MW)
Begin
building
Commercial
operation
Closed
Laguna Verde 1 BWR BWR-5 Operational 777 1 Oct 1976 28 Jul 1990
2 BWR BWR-5 Operational 775 1 Jun 1977 10 Apr 1995

Netherlands

[edit]
Plant
name
Unit
No.
Type Model Status Capacity
(MW)
Begin
building
Commercial
operation
Closed
Borssele 1 PWR KWU 2LP Operational 482 1 Jul 1969 26 Oct 1973 (2033)
Dodewaard 1 BWR BWR-2 Shut down 55 1 May 1965 26 Mar 1969 26 Mar 1997

North Korea

[edit]
Plant
name
Unit
No.
Type Model Status Capacity
(MW)
Begin
building
Commercial
operation
Closed
Yongbyon 1 GCR Magnox (Pu-production) Shut down[citation needed] 5[citation needed] 1994
2 LWR[88] Planned[88] 30
Taechon 1 Unfinished 200 1994
Kumho 1 PWR Unfinished 1000 2003
2 PWR Unfinished 1000 2003

Pakistan

[edit]
Plant
name
Unit
No.
Type Model Status Capacity
(MW)
Begin
building
Commercial
operation
Closed
Chashma 1 PWR CNP-300 Operational 300 1 Aug 1993 15 Sep 2000
2 PWR CNP-300 Operational 300 28 Dec 2005 18 May 2011
3 PWR CNP-300 Operational 315 28 May 2011 6 Dec 2016
4 PWR CNP-300 Operational 313 18 Dec 2011 19 Sep 2017
5 PWR Hualong One Planned 1080
Karachi 1 PHWR CANDU Shut down 90 1 Aug 1966 7 Dec 1972 1 Aug 2021
2 PWR Hualong One Operational 1014 23 May 2013 19 Mar 2021[89]
3 PWR Hualong One Operational 1014 31 May 2016 18 Apr 2022

Philippines

[edit]
Plant
name
Unit
No.
Type Model Status Capacity
(MW)
Begin
building
Commercial
operation
Closed
Bataan 1 PWR Westinghouse Unfinished; restart planned[90] 621 1976 1986

Poland

[edit]
Plant
name
Unit
No.
Type Model Status Capacity
(MW)
Begin
building
Commercial
operation
Closed
Żarnowiec 1 PWR VVER-440 Unfinished 440 31 Mar 1982 4 Sep 1990
2 PWR VVER-440 Unfinished 440 31 Mar 1982 4 Sep 1990
Choczewo[91] 1 PWR AP1000 Planned 1250[92] (2026) (2033)[91]
2 PWR AP1000 Planned 1250 (2035–2036)[91]
3 PWR AP1000 Planned 1250 (2037–2039)[91]
Pątnów[93] 1 PWR APR-1400 Planned 1340
2 PWR APR-1400 Planned 1340
Włocławek 1 BWR BWRX-300 Planned 300 (2030)[94]
Ostrołęka 1 BWR BWRX-300 Planned 300 (2030)[94]
Warsaw 1 BWR BWRX-300 Planned 300 (2030)[94]
Tarnobrzeg/Stalowa Wola 1 BWR BWRX-300 Planned 300 (2030)[94]
Dąbrowa Górnicza 1 BWR BWRX-300 Planned 300 (2030)[94]
Stawy Monowskie 1 BWR BWRX-300 Planned 300 (2030)[94]
Kraków 1 BWR BWRX-300 Planned 300 (2030)[94]

Romania

[edit]
Plant
name
Unit
No.
Type Model Status Capacity
(MW)
Begin
building
Commercial
operation
Closed
Cernavodă 1 PHWR CANDU-6 Operational 650 31 Mar 1983 2 Dec 1996
2 PHWR CANDU-6 Operational 650 1 Jul 1983 1 Nov 2007
3 PHWR CANDU-6 Unfinished; restart planned 650
4 PHWR CANDU-6 Unfinished; restart planned 650
5 PHWR CANDU-6 Unfinished 650

Russia

[edit]

Slovakia

[edit]
Plant
name
Unit
No.
Type Model Status Capacity
(MW)
Begin
building
Commercial
operation
Closed
Bohunice A-1[112] HWGCR KS 150 Decommissioned 93 1 Aug 1958 25 Dec 1972 22 Feb 1977
1[113] PWR VVER-440/V-230 Shut down 408 24 Apr 1972 1 Apr 1980 31 Dec 2006
2 PWR VVER-440/V-230 Shut down 408 24 Apr 1972 1 Jan 1981 31 Dec 2008
3 PWR VVER-440/V-213 Operational 472 1 Dec 1976 14 Feb 1985 (2045)
4 PWR VVER-440/V-213 Operational 471 1 Dec 1976 18 Dec 1985 (2045)
Mochovce 1 PWR VVER-440 V-213 Operational 436 13 Oct 1983 29 Oct 1998 (2058)
2 PWR VVER-440/V-213 Operational 436 13 Oct 1983 11 Apr 2000 (2060)
3 PWR VVER-440/V-213 Operational 440 27 Jan 1987 17 Oct 2023[114]
4 PWR VVER-440/V-213 Under construction 440 27 Jan 1987

Slovenia

[edit]
Plant
name
Unit
No.
Type Model Status Capacity
(MW)
Begin
building
Commercial
operation
Closed
Krško 1 PWR WH 2 loops Operational 688 30 Mar 1975 1 Jan 1983 (2043)[115]
2 PWR TBD Planned 1100 (2030)[116]

South Africa

[edit]
Plant
name
Unit
No.
Type Model Status Capacity
(MW)
Begin
building
Commercial
operation
Closed
Koeberg 1 PWR CP1 (France) Operational 930 1 Jul 1976 21 Jul 1984
2 PWR CP1 (France) Operational 930 1 Jul 1976 9 Nov 1985

South Korea

[edit]
Plant
name
Unit
No.
Type Model Status Capacity
(MW)
Begin
building
Commercial
operation
(planned)
Closed
Hanbit 1 PWR WH F Operational 960 4 Jun 1981 25 Aug 1986
2 PWR WH F Operational 958 10 Dec 1981 10 Jun 1987
3 PWR OPR-1000 Operational 997 23 Dec 1989 31 Mar 1995
4 PWR OPR-1000 Operational 997 26 May 1990 1 Jan 1996
5 PWR OPR-1000 Operational 997 29 Jun 1997 21 May 2002
6 PWR OPR-1000 Operational 995 20 Nov 1997 24 Dec 2002
Hanul 1 PWR CP1 (France) Operational 960 26 Jan 1983 10 Sep 1988
2 PWR CP1 (France) Operational 962 5 Jul 1983 30 Sep 1989
3 PWR OPR-1000 Operational 994 21 Jul 1993 11 Aug 1998
4 PWR OPR-1000 Operational 998 1 Nov 1993 31 Dec 1999
5 PWR OPR-1000 Operational 996 1 Oct 1999 29 Jul 2004
6 PWR OPR-1000 Operational 996 29 Sep 2000 22 Apr 2005
Shin-Hanul 1 PWR APR-1400 Operational 1340 10 Jul 2012 7 Dec 2022[117]
2 PWR APR-1400 Operational 1340 19 Jul 2012 5 Apr 2024[118]
3 PWR APR-1400 Under construction[119] 1340 30 Oct 2024 (2032)
4 PWR APR-1400 Under construction[119] 1340 30 Oct 2024 (2033)
Kori 1 PWR WH 60 Shut down 576 27 Apr 1972 29 Apr 1978 18 Jun 2017
2 PWR WH F Operational 640 4 Dec 1977 25 Jul 1983
3 PWR WH F Operational 1011 1 Oct 1979 30 Sep 1985
4 PWR WH F Operational 1012 1 Apr 1980 29 Apr 1986
Shin-Kori 1 PWR OPR-1000 Operational 996 16 Jun 2006 28 Feb 2011
2 PWR OPR-1000 Operational 996 5 Jun 2007 20 Jul 2012
Saeul 1 PWR APR-1400 Operational 1416 16 Oct 2008 15 Jan 2016
2 PWR APR-1400 Operational 1418 19 Aug 2009 29 Aug 2019[120]
3 PWR APR-1400 Under construction 1400 1 Apr 2017
4 PWR APR-1400 Under construction 1400 20 Sep 2018
Wolsong 1 PHWR CANDU-6 Shut down 657 30 Oct 1977 22 Apr 1983 24 Dec 2019
2 PHWR CANDU-6 Operational 655 22 Jun 1992 1 Jul 1997
3 PHWR CANDU-6 Operational 684 17 Mar 1994 1 Jul 1998
4 PHWR CANDU-6 Operational 688 22 Jul 1994 1 Oct 1999
Shin-Wolsong 1 PWR OPR-1000 Operational 991 20 Nov 2007 31 Jul 2012
2 PWR OPR-1000 Operational 960 23 Sep 2008 26 Feb 2015

Spain

[edit]
Plant
name
Unit
No.
Type Model Status Capacity
(MW)
Begin
building
Commercial
operation
Closed
Almaraz 1 PWR WH 3 loops Operational 1011 3 Jul 1973 1 Sep 1983
2 PWR WH 3 loops Operational 1006 3 Jul 1973 1 Jul 1984
Ascó 1 PWR WH 3 loops Operational 995 16 May 1974 10 Dec 1984
2 PWR WH-3 loops Operational 997 7 Mar 1975 31 Mar 1986
Cofrentes 1 BWR BWR-6 Operational 1064 9 Sep 1975 11 Mar 1985
José Cabrera 1 PWR WH 1 loop Shut down/in decommissioning 141 24 Jun 1964 13 Aug 1969 30 Apr 2006
Lemoniz 1 PWR Unfinished 1972 1984
2 PWR Unfinished 1972 1984
Santa María de Garoña 1 BWR BWR-3 Shut down/in decommissioning 446 11 May 1971 15 Feb 1975 6 Jul 2013
Trillo 1 PWR KWU 3 loops Operational 1003 17 Aug 1979 6 Aug 1988
Valdecaballeros 1 BWR Unfinished 1975 1984
2 BWR Unfinished 1975 1984
Vandellòs 1 GCR UNGG Shut down/in decommissioning 480 1967 2 Aug 1972 31 Jul 1990
2 PWR WH 3 loops Operational 1045 29 Dec 1980 8 Mar 1988

Sweden

[edit]
Plant
name
Unit
No.
Type Model Status Capacity
(MW)
Begin
building
Commercial
operation
Closed
Ågesta 1 PHWR R3 Shut down/in decommissioning 10 1 Dec 1957 1 May 1964 2 Jun 1974 [a]
Barsebäck 1 BWR ASEA-II Shut down/in decommissioning 600 1 Feb 1971 1 Jul 1975 30 Nov 1999 [b]
2 BWR ASEA-II Shut down/in decommissioning 600 1 Jan 1973 1 Jul 1977 31 May 2005 [c]
Forsmark 1 BWR ASEA-III, BWR-2500 Operational 986 1 Jun 1973 10 Dec 1980 [d]
2 BWR ASEA-III, BWR-2500 Operational 1116 1 Jan 1975 7 Jul 1981 [e]
3 BWR ASEA-IV, BWR-3000 Operational 1167 1 Jan 1979 18 Aug 1985 [f]
Oskarshamn 1 BWR ASEA-I Shut down/in decommissioning 473 1 Aug 1966 6 Feb 1972 19 Jun 2017 [g]
2 BWR ASEA-II Shut down/in decommissioning 638 1 Sep 1969 1 Jan 1975 22 Dec 2016 [h]
3 BWR ASEA-IV, BWR-3000 Operational 1450 1 May 1980 15 Aug 1985 [i]
Marviken 1 BHWR R4 Unfinished 196 1 Apr 1965 27 May 1970 [j]
Ringhals 1 BWR ASEA-I Shut down/in decommissioning 881 1 Feb 1969 1 Jan 1976 31 Dec 2020 [k]
2 PWR WH 3-loops Shut down/in decommissioning 904 1 Oct 1970 1 May 1975 30 Dec 2019 [l]
3 PWR WH 3-loops Operational 1062 1 Sep 1972 9 Sep 1981 [m]
4 PWR WH 3-loops Operational 1104 1 Nov 1973 21 Nov 1983 [n]

Switzerland

[edit]
Plant
name
Unit
No.
Type Model Status Capacity
(MW)
Begin
building
Commercial
operation
Closed[126]
Beznau 1 PWR WH 2-loops Operational 365 1 Sep 1965 1 Sep 1969 (2029)
2 PWR WH 2-loops Operational 365 1 Jan 1968 1 Dec 1971 (2031)
Gösgen 1 PWR KWU 3-loops Operational 1010 1 Dec 1973 1 Nov 1979
Leibstadt 1 BWR BWR-6 Operational 1220 1 Jan 1974 15 Dec 1984
Lucens 1 HWGCR HWGCR Decommissioned 6 1 Apr 1962 29 Dec 1966 21 Jan 1969
Mühleberg 1 BWR BWR-4 Shut down/in decommissioning 373 1 Mar 1967 6 Nov 1972 20 Dec 2019

Taiwan

[edit]
Plant
name
Unit
No.
Type Model Status Capacity
(MW)
Begin
building
Commercial
operation
Closed
Jinshan 1 BWR BWR-4 Shut down/in decommissioning 636 2 Jun 1972 10 Dec 1978 3 Oct 2018
2 BWR BWR-4 Shut down/in decommissioning 636 7 Dec 1973 15 Jul 1979 3 Oct 2018
Kuosheng 1 BWR BWR-6 Shut down 985 19 Nov 1975 28 Dec 1981 1 Jul 2021[127]
2 BWR BWR-6 Shut down 985 15 Mar 1976 16 Mar 1983 15 Mar 2023
Lungmen 1 BWR ABWR Unfinished 1350 31 Mar 1999 27 April 2014 [128]
2 BWR ABWR Unfinished 1350 30 Aug 1999 27 April 2014 [128]
Maanshan 1 PWR WH 312 3-loop Shut down 951 21 Aug 1978 27 Jul 1984 28 Jul 2024
2 PWR WH 312 3-loop Operational 951 21 Feb 1979 18 May 1985

Turkey

[edit]
Plant
name
Unit
No.
Type Model Status Capacity
(MW)
Begin
building
Commercial
operation
Closed
Akkuyu 1 PWR VVER-1200/V-509 Under construction 1114 3 Apr 2018 (2025)[129]
2 PWR VVER-1200/V-509 Under construction 1114 8 Apr 2020 (2026)
3 PWR VVER-1200/V-509 Under construction 1114 10 Mar 2021 (2027)
4 PWR VVER-1200/V-509 Under construction 1114 21 Jul 2022[130] (2028)
Sinop[131][132] 1 PWR Atmea-1 Cancelled 1100
2 PWR Atmea-1 Cancelled 1100
3 PWR Atmea-1 Cancelled 1100
4 PWR Atmea-1 Cancelled 1100

Ukraine

[edit]

United Arab Emirates

[edit]
Plant
name
Unit
No.
Type Model Status Capacity
(MW)
Begin
building
Commercial
operation
Closed
Barakah 1 PWR APR-1400 Operational 1345 19 Jul 2012 6 Apr 2021[137]
2 PWR APR-1400 Operational 1345 16 Apr 2013 24 Mar 2022[138]
3 PWR APR-1400 Operational 1345 24 Sep 2014 24 Feb 2023[139]
4 PWR APR-1400 Operational 1345 30 Jul 2015 5 Sep 2024[140]

United Kingdom

[edit]

United States

[edit]

Uzbekistan

[edit]
Plant
name
Unit
No.
Type Model Status Capacity
(MW)
Begin
building
Commercial
operation
Closed
Plant in the Jizzakh Region 1 PWR VVER-1200 Planned 1200
2 PWR VVER-1200 Planned 1200

See also

[edit]

Notes

[edit]
  1. ^ The full reactor model name is R3/Adam.[121]
  2. ^ The full reactor model name is ASEA-ATOM Gen II.[122]
  3. ^ The full reactor model name is ASEA-ATOM Gen II.[122]
  4. ^ The full reactor model name is ASEA-ATOM Gen III,[122] BWR-2500,[122] BWR 69.[123]
  5. ^ The full reactor model name is ASEA-ATOM Gen III,[122] BWR-2500,[122] BWR 69.[123]
  6. ^ The full reactor model name is ASEA-ATOM Gen IV,[122] BWR-3000,[122] BWR 75.[123]
  7. ^ The full reactor model name is ASEA-ATOM Gen I.[122]
  8. ^ The full reactor model name is ASEA-ATOM Gen II.[122]
  9. ^ The full reactor model name is ASEA-ATOM Gen IV,[122] BWR-3000,[122] BWR 75.[124]
  10. ^ The full reactor model name is R4/Eva. Construction date is approximate. Data are from Swedish Radiation Safety Authority.[121]
  11. ^ The full reactor model name is ASEA-ATOM Gen I.[122] Closed at midnight on New Year's Eve.[125]
  12. ^ The full reactor model name is Westinghouse 3-loops.[122]
  13. ^ The full reactor model name is Westinghouse 3-loops.[122]
  14. ^ The full reactor model name is Westinghouse 3-loops.[122]

References

[edit]
  1. ^ "World Nuclear Power Reactors & Uranium Requirements". world-nuclear.org. World Nuclear Association. Retrieved 5 May 2020.
  2. ^ "PRIS – Home". pris.iaea.org.
  3. ^ "Reference Unit Power" at IAEA
  4. ^ "Nuclear Power in Argentina | Argentinian Nuclear Energy – World Nuclear Association". world-nuclear.org. Retrieved 4 August 2019.
  5. ^ "China inks $8 bln nuclear power plant deal in Argentina". Reuters. 2 February 2022. Retrieved 2 February 2022.
  6. ^ Yulia Kosarenko. "NASA fact sheet". Archived from the original on 8 July 2007. Retrieved 20 August 2015.
  7. ^ "The Embalse Nuclear Power Plant returns to service for a new cycle of 30 years". BNamericas.com.
  8. ^ "Metsamor 2 to operate until 2026 : Corporate – World Nuclear News".
  9. ^ "Nuclear Power in Bangladesh – World Nuclear Association". world-nuclear.org. Retrieved 17 July 2018.
  10. ^ "Росатом Госкорпорация "Росатом" ядерные технологии атомная энергетика АЭС ядерная медицина". rosatom.ru.
  11. ^ "Second Belarus unit enters commercial operation". world-nuclear-news.org.
  12. ^ "Doel 3: Shutdown confirmed for Friday". RTBF Info. 23 September 2022. Retrieved 25 September 2022.
  13. ^ "RTBF Info of 21 Dec 2018". RTBF Info. 21 December 2018. Retrieved 28 December 2018.
  14. ^ "Second Belgian reactor enters retirement : Corporate - World Nuclear News".
  15. ^ a b c "Plans for New Nuclear Reactors Worldwide - World Nuclear Association".
  16. ^ a b c "Bulgaria to push ahead with two new units at Kozloduy". world-nuclear-news.org. World Nuclear News. 25 October 2023. Retrieved 3 November 2023.
  17. ^ "Utility abandons Pickering reactor overhaul". The Globe and Mail. 13 August 2005.
  18. ^ "Ontario extends Pickering operations". World Nuclear News. 30 September 2022. Retrieved 7 July 2023.
  19. ^ a b Patel, Sonal (2 December 2021). "Darlington Nuclear Plant Will Get a BWRX-300 SMR as GE Hitachi Bags Lucrative OPG Selection". POWER Magazine. Retrieved 5 December 2021.
  20. ^ "Additional SMRs in the pipeline for Darlington". World Nuclear News. 7 July 2023. Retrieved 7 July 2023.
  21. ^ "Unit 2 sets record run ahead of planned maintenance outage". brucepower.com. 6 May 2022. Retrieved 7 July 2023.
  22. ^ "Life-Extension Program & MCR Project". brucepower.com. Retrieved 7 July 2023.
  23. ^ "Bruce 6 re-enters commercial operation : Corporate - World Nuclear News".
  24. ^ a b "China / Construction Begins of Two Hualong One Reactors at Changjiang". The Independent Global Nuclear News Agency. Retrieved 28 November 2019.
  25. ^ a b "我国自主三代核电华龙一号在海南正式开工建设". CNNC. Retrieved 2 April 2021.[permanent dead link]
  26. ^ "China's first Hualong One nuclear reactor starts Opened". Reuters. 30 January 2021. Retrieved 30 January 2021.
  27. ^ "Second Fuqing Hualong One enters Opened: New Nuclear – World Nuclear News".
  28. ^ "Second AP1000 enters Opened". World Nuclear News. World Nuclear Association. Retrieved 24 October 2018.
  29. ^ "Fourth Chinese AP1000 enters Opened". World Nuclear News. World Nuclear Association. Retrieved 13 January 2019.
  30. ^ "Begin
    buildings on third Haiyang unit"
    . World Nuclear News. World Nuclear Association. Retrieved 25 July 2022.
  31. ^ "Construction begins of fourth Haiyang unit". World Nuclear News. World Nuclear Association. Retrieved 26 April 2023.
  32. ^ "China Nuclear Power | Chinese Nuclear Energy – World Nuclear Association". world-nuclear.org. Retrieved 16 July 2018.
  33. ^ "Fifth Hongyanhe unit enters Opened". World Nuclear News. World Nuclear Association. Retrieved 2 August 2021.
  34. ^ "China Nuclear Power | Chinese Nuclear Energy – World Nuclear Association". world-nuclear.org. Retrieved 15 June 2018.
  35. ^ "Construction of Lufeng 5 gets under way". World Nuclear News. World Nuclear Association. Retrieved 9 September 2022.
  36. ^ "Construction of Lufeng 6 begins". World Nuclear News. World Nuclear Association. Retrieved 29 August 2023.
  37. ^ "Construction of new Chinese power plant begins: New Nuclear – World Nuclear News". world-nuclear-news.org. Retrieved 5 January 2021.
  38. ^ "First concrete for unit 2 of China's San'ao nuclear power project- Nuclear Engineering International". Retrieved 4 January 2022.
  39. ^ "First AP1000 reactor enters Opened". World Nuclear News. World Nuclear Association. Retrieved 24 October 2018.
  40. ^ "Sanmen 2 AP1000 enters Opened – World Nuclear News". world-nuclear-news.org. Retrieved 7 November 2018.
  41. ^ "PRIS – Reactor Details". pris.iaea.org. Retrieved 8 July 2022.
  42. ^ "Begin
    buildings on fourth Sanmen unit"
    . world-nuclear-news.org. Retrieved 23 March 2023.
  43. ^ "China's demonstration HTR-PM enters commercial operation : New Nuclear - World Nuclear News".
  44. ^ "Shidaowan Guohe One 1".
  45. ^ "Shidaowan Guohe One 2".
  46. ^ a b "China approves first new nuclear reactors in 3-plus years". Nikkei Asian Review. Retrieved 2 August 2019.
  47. ^ "EDF : le premier des 2 EPR de la centrale de Taishan (Chine) entre en exploitation commerciale". Capital.fr (in French). 14 December 2018. Retrieved 14 December 2018.[permanent dead link]
  48. ^ "World's second EPR starts operations". Retrieved 10 September 2019.
  49. ^ "Fourth Tianwan unit enters Opened". World Nuclear News. World Nuclear Association. Retrieved 27 December 2018.
  50. ^ "Fifth Tianwan unit starts Opened". World Nuclear News. World Nuclear Association. Retrieved 9 September 2020.
  51. ^ "Tianwan 6 enters commercial operation : New Nuclear - World Nuclear News".
  52. ^ "Begin
    buildings on eighth Tianwan unit: New Nuclear – World Nuclear News"
    .
  53. ^ "Fast nuclear reactor to start construction in Fujian in 2017". 16 August 2015. Archived from the original on 17 August 2015. Retrieved 16 August 2015.
  54. ^ "China starts building second CFR-600 fast reactor: New Nuclear – World Nuclear News". world-nuclear-news.org. Retrieved 30 December 2020.
  55. ^ "Work on Xudabao unit 1 gets under way". world-nuclear-news.org. Retrieved 17 November 2023.
  56. ^ "Дан старт сооружению новых блоков российского дизайна атомных станций "Тяньвань" и "Сюйдапу" (Китай)". ruscable.ru.
  57. ^ "Construction of Xudapu 4 under way: New Nuclear – World Nuclear News".
  58. ^ "Yangjiang 5 enters Opened". world-nuclear-news.org. Retrieved 16 July 2018.
  59. ^ "Begin
    buildings on first Zhangzhou unit – World Nuclear News"
    . world-nuclear-news.org. Retrieved 18 October 2019.
  60. ^ "Construction of Egypt's first nuclear power plant under way : New Nuclear – World Nuclear News".
  61. ^ "PRIS – Reactor Details".
  62. ^ "Construction begins of third unit at Egypt's el Dabaa nuclear power plant : New Nuclear - World Nuclear News".
  63. ^ "Nuclear power plants in Finland". STUK. 6 April 2021. Retrieved 13 May 2022.
  64. ^ "Fennovoima cancels Hanhikivi 1 contract with Russia". World Nuclear Association. 3 May 2022.
  65. ^ "Fennovoima terminates contract for Hanhikivi 1 NPP construction". TASS. 2 May 2022.
  66. ^ "PRIS – Reactor Details".
  67. ^ "Faulty seals replaced in Olkiluoto EPR : Regulation & Safety - World Nuclear News".
  68. ^ "Further delay to Flamanville EPR start up". World Nuclear News.
  69. ^ "EDF begins permitting process for two new reactors at Penly : New Nuclear - World Nuclear News". world-nuclear-news.org. Retrieved 9 December 2023.
  70. ^ a b "Germany shuts three of its last six nuclear plants". Retrieved 1 January 2022.
  71. ^ "German reactor permanently shut down". world-nuclear-news.org. Retrieved 10 May 2018.
  72. ^ "Germany shuts down Philippsburg 2". energycentral.com. Retrieved 8 January 2020.
  73. ^ a b c d e f g h i j k l m n o p q "Status report 74 – Indian 220 MWe PHWR (IPHWR-220)" (PDF).
  74. ^ a b c d "Status report 105 – Indian 700 MWe PHWR (IPHWR-700)" (PDF).
  75. ^ "В Индии началось сооружение блока № 6 АЭС "Куданкулам"". ase-ec.ru (in Russian). Retrieved 21 December 2021.
  76. ^ "PRIS – Reactor Details".
  77. ^ "Genkai unit 4 supplying power again". world-nuclear-news.org. Retrieved 22 June 2018.
  78. ^ a b c d e f g h "Licensing status for the Japanese nuclear facilities – Japan Nuclear Safety Institute". genanshin.jp. Retrieved 3 October 2021.
  79. ^ "東通原子力発電所1号機の着工について". Tokyo Electric Power Company Holdings, Inc. Retrieved 27 June 2023.
  80. ^ a b "Nuclear Power Plants in Japan – The Federation of Electric Power Companies of Japan(FEPC)". fepc.or.jp. Retrieved 8 May 2018.
  81. ^ "40年超の美浜原発3号機が再稼働 原発事故後 全国初". NHK. Retrieved 23 June 2021.
  82. ^ "Ohi No.4 reactor restarted- News – NHK WORLD – English". NHK WORLD. Archived from the original on 10 May 2018. Retrieved 10 May 2018.
  83. ^ "Japan's Tohoku Elec restarts Onagawa reactor after 13-year hiatus – Reuters". Reuters. Retrieved 29 October 2024.
  84. ^ "First Japanese BWR cleared for restart : Regulation & Safety – World Nuclear News".
  85. ^ "運転開始40年超高浜原発1号機 約12年ぶりに再稼働". Retrieved 28 July 2023.
  86. ^ "Takahama 2 reactor restarted". Retrieved 15 September 2023.
  87. ^ "Japan approves extension for reactor similar to Fukushima units that melted down – Reuters". Reuters. Retrieved 29 December 2019.
  88. ^ a b "North Korea's Yongbyon Nuclear Facility: Slow Progress at the Experimental Light Water Reactor". 38 North. U.S.-Korea Institute, Johns Hopkins University School of Advanced International Studies. 14 January 2016. Archived from the original on 9 April 2016. Retrieved 4 April 2016.
  89. ^ "PRIS - Reactor Details".
  90. ^ "Philippines relaunches nuclear energy programme : Nuclear Policies". World Nuclear News. 3 March 2022. Retrieved 29 April 2022.
  91. ^ a b c d "Poland's Westinghouse choice 'deepens strategic relationship' with USA". 31 October 2022.
  92. ^ "Poland's government confirms Westinghouse for nuclear plant". 4 November 2022.
  93. ^ "South Korea's KHNP signs letter of intent on Polish nuclear". 31 October 2022.
  94. ^ a b c d e f g "Taki reaktor chcą zbudować Orlen i Synthos". 18 April 2023.
  95. ^ "Rosatom State Atomic Energy Cooperation | ROSATOM's first of a kind floating power unit connects to isolated electricity grid in Pevek, Russia's Far East". rosatom.ru. Retrieved 1 January 2020.
  96. ^ a b "Nuclear Power in Russia | Russian Nuclear Energy – World Nuclear Association". world-nuclear.org. Retrieved 14 May 2018.
  97. ^ "Кольскую АЭС-2 начнут строить в 2028 году". Retrieved 9 December 2023.
  98. ^ "Kursk's second unit retires after 45 years operation". Retrieved 31 January 2024.
  99. ^ "Запуск первого энергоблока Курской АЭС-2 планируется в декабре 2024". Ixbt.com.
  100. ^ "The construction of the 2nd innovative VVER-TOI power block at the Kursk NPP-2 site has started ahead of schedule". rosenergoatom.ru. Retrieved 16 April 2019.
  101. ^ "Russia retires Leningrad unit 1". World Nuclear News. World Nuclear Association. Retrieved 27 December 2018.
  102. ^ "Four New NPP Units Will be Built in Russia".
  103. ^ "Ленинградской атомной станции добавят мощности". 15 March 2024.
  104. ^ "Russia commits to further floating NPPs : New Nuclear – World Nuclear News". world-nuclear-news.org. Retrieved 28 July 2021.
  105. ^ ""Росатом" и Kaz Minerals предварительно договорились о поставках электроэнергии для Баимского ГОКа". Interfax.ru (in Russian). Retrieved 3 September 2021.
  106. ^ "Russia plans new generation of FNPPS – Nuclear Engineering International". 6 January 2021.
  107. ^ a b "Заложен корпус первого плавучего энергоблока в арктическом исполнении на базе реакторов РИТМ-200 – Атомэнергомаш". aem-group.ru. Archived from the original on 30 August 2022. Retrieved 30 August 2022.
  108. ^ "В Якутии собираются строить АЭС мощностью не менее 55 МВт".
  109. ^ ""Росатом" начал строительство реактора Брест-300 в Северске". 8 June 2021.
  110. ^ "Russia prepares to build new nuclear reactors at Leningrad and Smolensk – Nuclear Engineering International". 26 June 2020.
  111. ^ "VVER units planned for Leningrad and Smolensk".
  112. ^ Shut down after a 1977 refuelling incident; decommission in progress since 1979
  113. ^ "Tlačová agentúra Slovenskej republiky – TASR.sk". tasr.sk. Archived from the original on 20 January 2009.
  114. ^ "Power commissioning of Mochovce 3 completed".
  115. ^ "Krško gets an overhaul : Corporate – World Nuclear News".
  116. ^ "Drugi blok NE Krško prve megavate mogao bi dati nakon 2030" [The second block of NPP Krško could provide the first megawatts after 2030.]. Točka na I (in Croatian). 30 November 2022. Retrieved 14 April 2023.
  117. ^ "South Korean APR-1400 starts Opened : New Nuclear - World Nuclear News".
  118. ^ "Unit 2 at South Korean nuclear reactor enters commercial operation". 9 April 2024.
  119. ^ a b "South Korea breaks ground for two new reactors". Retrieved 30 October 2024.
  120. ^ "Second APR-1400 unit starts Opened". world-nuclear-news.org. Retrieved 3 September 2019.
  121. ^ a b "Marvikenreaktorn - ett industripolitiskt utvecklingsprojekt i otakt med tiden". The Swedish Radiation Safety Authority (in Swedish). 31 March 2007. Retrieved 12 January 2023.
  122. ^ a b c d e f g h i j k l m n o p "IAEA Sweden reactors". IAEA. 11 January 2023. Retrieved 12 January 2023.
  123. ^ a b c "Forsmarks reaktorer i siffror" (PDF). Vattenfall (in Swedish). April 2016. Retrieved 12 January 2023.
  124. ^ "MILSTOLPAR I VÅR HISTORIA". Westinghouse (in Swedish). Retrieved 12 January 2023.
  125. ^ "Ringhals 1 inne på slutspurten". SVT (in Swedish). 26 October 2020. Retrieved 29 December 2020.
  126. ^ admin.ch, The Federal Authorities, Federal Council decides to gradually phase out nuclear energy as part of its new energy strategy Archived 20 June 2013 at the Wayback Machine, 25 May 2011
  127. ^ "Early shutdown for Taiwanese reactor : Corporate". World Nuclear News. 1 July 2021. Retrieved 29 April 2022.
  128. ^ a b "封存核四 馬英九:為下一代保留選擇權". 自由時報電子報 (in Chinese (Taiwan)). 27 April 2014. Retrieved 8 November 2024. 馬英九總統、閣揆江宜樺下午邀集黨籍縣市首長舉行會議,會後國民黨發言人范姜泰基轉述,今日會議達成兩點共識,分別是「核四一號機不施工、只安檢,安檢後封存;核四二號機全部停工」,以及「行政院承諾儘速召開全國能源會議,以確保未來供電無虞」。
  129. ^ "Major components in place at Akkuyu 1 : New Nuclear". World Nuclear News. 4 March 2022. Retrieved 29 April 2022.
  130. ^ "Construction begins of fourth Turkish reactor : New Nuclear – World Nuclear News".
  131. ^ "Japan looks to cancel Turkish project – Nuclear Engineering International". 6 December 2018.
  132. ^ "Turkey, Japan scrap partnership in Sinop nuclear plant in Turkey's north – Turkey News". 20 January 2020.
  133. ^ "В Україні збудують нову атомну станцію: названо місто будівництва". GSMinfo. 22 September 2022. Retrieved 9 December 2023.
  134. ^ "На Хмельницькій АЕС відбулася нарада з питань будівництва 3 та 4 енергоблоків". xaec.org.ua. 12 February 2021. Archived from the original on 24 February 2021. Retrieved 7 November 2022.
  135. ^ "Ukraine begins construction of new units at Khmelnitsky NPP". 17 April 2024.
  136. ^ a b c "Is it sensible to invest in the construction of new nuclear reactors during post-war reconstruction? – Ecoclub Rivne is an environmental NGO".
  137. ^ "UAE's first nuclear power plant begins Openeds". Reuters. 6 April 2021. Retrieved 6 April 2021.
  138. ^ "Barakah / Unit 2 Begins Opened at Arab World's First Nuclear Station :: NucNet | the Independent Nuclear News Agency". 23 February 2022.
  139. ^ "Third Barakah unit begins Opened : New Nuclear - World Nuclear News".
  140. ^ "UAE Celebrates Historic Milestone as Unit 4 of the Barakah Plant Commences Commercial Operation: Delivering Full-fleet Operations". 5 September 2024.
  141. ^ a b c d e f g h Ambrose, Jillian (4 December 2024). "Four of UK's oldest nuclear plants to run for even longer as Hinkley Point delayed". Retrieved 4 December 2024.
  142. ^ "Hinkley Point B enters retirement : Corporate – World Nuclear News". world-nuclear-news.org. Retrieved 2 August 2022.
  143. ^ "PRIS – Reactor Details". pris.iaea.org. Retrieved 25 July 2022.
  144. ^ "Hunterston B nuclear power station retires after 46 years in service". The Guardian. 7 January 2022.
  145. ^ "The Sizewell C project – National Infrastructure Planning". infrastructure.planninginspectorate.gov.uk. Retrieved 12 April 2022.
  146. ^ "PRIS – Reactor Details". pris.iaea.org. Retrieved 24 January 2019.
  147. ^ "PRIS – Reactor Details". iaea.org. Retrieved 11 May 2018.
  148. ^ "PRIS – Reactor Details". iaea.org. Retrieved 11 May 2018.
  149. ^ "PRIS – Reactor Details". iaea.org. Retrieved 11 May 2018.
  150. ^ "Brunswick-1". IAEA. Retrieved 14 April 2013.
  151. ^ "Brunswick-2". IAEA. Retrieved 14 April 2013.
  152. ^ "Scaled down SMR pilot project remains on course : New Nuclear". World Nuclear News. 23 July 2021. Retrieved 29 April 2022.
  153. ^ "Idaho SMR project terminated". World Nuclear News. 9 November 2023. Retrieved 9 November 2023.
  154. ^ a b c d "TVA Prepares to Write Final Nuclear Chapters". American Nuclear Society. 17 April 2015. Archived from the original on 29 July 2023. Retrieved 5 October 2023.
  155. ^ a b c d e f g h Tennessee Valley Authority. "Hartsville Nuclear Plant Site, Transfer of TVA Property For Industrial Park" (PDF). Archived from the original (PDF) on 5 January 2009. Retrieved 5 October 2023.
  156. ^ a b "Entergy's Indian Point Unit 2 to Shut Down Permanently". Indian Point Energy Center. 29 April 2020. Archived from the original on 3 August 2020. Retrieved 30 April 2020.
  157. ^ "PRIS – Reactor Details".
  158. ^ StarTribune.com, WILSON RING Vermont Yankee nuclear power plant ends operations after 42 years of producing electricity Archived 29 December 2014 at the Wayback Machine, 29 Dec 2014
  159. ^ "Vogtle Unit 3 goes into operation". Cision. 31 July 2023. Retrieved 31 July 2023.
  160. ^ "Commercial operation marks completion of Vogtle expansion : New Nuclear - World Nuclear News".
[edit]